{"created":"2023-05-15T12:05:19.280326+00:00","id":9954,"links":{},"metadata":{"_buckets":{"deposit":"3dcd6560-ef62-41ec-91fe-19904d2a4d2d"},"_deposit":{"created_by":3,"id":"9954","owners":[3],"pid":{"revision_id":0,"type":"depid","value":"9954"},"status":"published"},"_oai":{"id":"oai:iwate-u.repo.nii.ac.jp:00009954","sets":["1515:1519"]},"author_link":["61824","61826","61825","61823"],"item_16_biblio_info_7":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"1991-04-01","bibliographicIssueDateType":"Issued"},"bibliographicIssueNumber":"536","bibliographicPageEnd":"1407","bibliographicPageStart":"1402","bibliographicVolumeNumber":"57","bibliographic_titles":[{"bibliographic_title":"日本機械学會論文集. C編"}]}]},"item_16_date_6":{"attribute_name":"登録日","attribute_value_mlt":[{"subitem_date_issued_datetime":"2010-08-23"}]},"item_16_description_12":{"attribute_name":"Abstract","attribute_value_mlt":[{"subitem_description":"In this paper, we consider the modelling of split automatic transfer lines in which two types of jobs are manufactured and the setup is required in a common operation stage, and analyze the effects of average lot sizes, average setup times and buffer storage capacities on the line production rate. From the numerical analysis, it is shown that the average lot size has the opposite effect on the decrease of the production rates caused by the split interference and by the setup, and that there exists an optimum average lot size yielding the maximum production rate. Furthermore, we analyze the upper limit of the rate yielded in the lines with no split interference, and using the limit and another limit, i. e. the production rate yielded in the line with no setup, we estimate the optimum average lot size.","subitem_description_type":"Other"}]},"item_16_full_name_3":{"attribute_name":"著者別名","attribute_value_mlt":[{"nameIdentifiers":[{"nameIdentifier":"61825","nameIdentifierScheme":"WEKO"}],"names":[{"name":"IYAMA, Toshirou"}]},{"nameIdentifiers":[{"nameIdentifier":"61826","nameIdentifierScheme":"WEKO"}],"names":[{"name":"WATANABE, Yuuetsu"}]}]},"item_16_publisher_14":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"社団法人日本機械学会"}]},"item_16_rights_18":{"attribute_name":"権利","attribute_value_mlt":[{"subitem_rights":"copyright (c) 社団法人日本機械学会"}]},"item_16_source_id_9":{"attribute_name":"ISSN","attribute_value_mlt":[{"subitem_source_identifier":"0387-5024","subitem_source_identifier_type":"ISSN"}]},"item_16_text_4":{"attribute_name":"著者(機関)","attribute_value_mlt":[{"subitem_text_value":"岩手大学工学部"},{"subitem_text_value":"三菱電機(株)"}]},"item_16_version_type_27":{"attribute_name":"著者版フラグ","attribute_value_mlt":[{"subitem_version_resource":"http://purl.org/coar/version/c_970fb48d4fbd8a85","subitem_version_type":"VoR"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"井山, 俊郎"}],"nameIdentifiers":[{"nameIdentifier":"61823","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"渡邊, 雄悦"}],"nameIdentifiers":[{"nameIdentifier":"61824","nameIdentifierScheme":"WEKO"}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_login","displaytype":"detail","filename":"tjsmec-v57n536p1402-1407.pdf","filesize":[{"value":"402.5 kB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"tjsmec-v57n536p1402-1407","url":"https://iwate-u.repo.nii.ac.jp/record/9954/files/tjsmec-v57n536p1402-1407.pdf"},"version_id":"08394ed0-8256-447e-9de4-057c78c27999"}]},"item_keyword":{"attribute_name":"キーワード","attribute_value_mlt":[{"subitem_subject":"Production System","subitem_subject_scheme":"Other"},{"subitem_subject":"Process Planning","subitem_subject_scheme":"Other"},{"subitem_subject":"Production Planning","subitem_subject_scheme":"Other"},{"subitem_subject":"Split Automatic Transfer Line","subitem_subject_scheme":"Other"},{"subitem_subject":"Split Interference","subitem_subject_scheme":"Other"},{"subitem_subject":"Average Setup Time","subitem_subject_scheme":"Other"},{"subitem_subject":"Buffer Storage","subitem_subject_scheme":"Other"},{"subitem_subject":"Production Rate","subitem_subject_scheme":"Other"},{"subitem_subject":"Optimum verage Lot Size","subitem_subject_scheme":"Other"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"jpn"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"journal article","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"分岐形自動化生産ラインにおける最適ロットサイズ","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"分岐形自動化生産ラインにおける最適ロットサイズ"}]},"item_type_id":"16","owner":"3","path":["1519"],"pubdate":{"attribute_name":"公開日","attribute_value":"2010-08-23"},"publish_date":"2010-08-23","publish_status":"0","recid":"9954","relation_version_is_last":true,"title":["分岐形自動化生産ラインにおける最適ロットサイズ"],"weko_creator_id":"3","weko_shared_id":3},"updated":"2023-12-19T03:20:11.153843+00:00"}