{"created":"2023-05-15T12:05:19.767348+00:00","id":9965,"links":{},"metadata":{"_buckets":{"deposit":"8fe4b48d-fe44-4acd-816a-85d63cf2d994"},"_deposit":{"created_by":3,"id":"9965","owners":[3],"pid":{"revision_id":0,"type":"depid","value":"9965"},"status":"published"},"_oai":{"id":"oai:iwate-u.repo.nii.ac.jp:00009965","sets":["1515:1519"]},"author_link":["61900","61902","61899","61897","61903","61898","61901","61904"],"item_16_biblio_info_7":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"1995-06-01","bibliographicIssueDateType":"Issued"},"bibliographicIssueNumber":"586","bibliographicPageEnd":"2623","bibliographicPageStart":"2618","bibliographicVolumeNumber":"61","bibliographic_titles":[{"bibliographic_title":"日本機械学會論文集. C編"}]}]},"item_16_date_6":{"attribute_name":"登録日","attribute_value_mlt":[{"subitem_date_issued_datetime":"2010-08-24"}]},"item_16_description_12":{"attribute_name":"Abstract","attribute_value_mlt":[{"subitem_description":"An approximation method is proposed to estimate the system production rate for an automatic merge machining-assembly production system in which L parts are machined in multi-stage series lines and are assembled. In this method, the system is decomposed into L series machining lines, each of which considers the parts delay occurring in other series machining lines. From the comparison between approximation and simulation results, it is found that the estimation error is very small. Furthermore, we study the effects of system parameters on the system production rate. The main results are as follows. (1) As the number of machining lines feeding assembly parts increases, the production rate decreases but the decrease becomes slight. (2) When the number of stages in machining lines is greater than two, the number of stages has little effect on the production rate.","subitem_description_type":"Other"}]},"item_16_full_name_3":{"attribute_name":"著者別名","attribute_value_mlt":[{"nameIdentifiers":[{"nameIdentifier":"61901","nameIdentifierScheme":"WEKO"}],"names":[{"name":"IYAMA, Toshirou"}]},{"nameIdentifiers":[{"nameIdentifier":"61902","nameIdentifierScheme":"WEKO"}],"names":[{"name":"MIZUNO, Masahiro"}]},{"nameIdentifiers":[{"nameIdentifier":"61903","nameIdentifierScheme":"WEKO"}],"names":[{"name":"HONDA, Norio"}]},{"nameIdentifiers":[{"nameIdentifier":"61904","nameIdentifierScheme":"WEKO"}],"names":[{"name":"GOTO, Shozo"}]}]},"item_16_publisher_14":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"社団法人日本機械学会"}]},"item_16_relation_16":{"attribute_name":"異版である","attribute_value_mlt":[{"subitem_relation_type":"isVersionOf","subitem_relation_type_id":{"subitem_relation_type_id_text":"http://ci.nii.ac.jp/naid/110002381980/","subitem_relation_type_select":"URI"}}]},"item_16_rights_18":{"attribute_name":"権利","attribute_value_mlt":[{"subitem_rights":"copyright (c) 社団法人日本機械学会"},{"subitem_rights":"本文データは学協会の許諾に基づきCiNiiから複製したものである"}]},"item_16_source_id_9":{"attribute_name":"ISSN","attribute_value_mlt":[{"subitem_source_identifier":"0387-5024","subitem_source_identifier_type":"ISSN"}]},"item_16_text_4":{"attribute_name":"著者(機関)","attribute_value_mlt":[{"subitem_text_value":"岩手大学工学部"},{"subitem_text_value":"岩手大学工学部"},{"subitem_text_value":"岩手大学大学院"},{"subitem_text_value":"NTN(株)生産技術研究所"}]},"item_16_version_type_27":{"attribute_name":"著者版フラグ","attribute_value_mlt":[{"subitem_version_resource":"http://purl.org/coar/version/c_970fb48d4fbd8a85","subitem_version_type":"VoR"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"井山, 俊郎"}],"nameIdentifiers":[{}]},{"creatorNames":[{"creatorName":"水野, 雅裕"}],"nameIdentifiers":[{}]},{"creatorNames":[{"creatorName":"本田, 則夫"}],"nameIdentifiers":[{}]},{"creatorNames":[{"creatorName":"後藤, 正三"}],"nameIdentifiers":[{}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2016-11-14"}],"displaytype":"detail","filename":"tjsmec-v61n586p2618-2623.pdf","filesize":[{"value":"481.7 kB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"tjsmec-v61n586p2618-2623.pdf","url":"https://iwate-u.repo.nii.ac.jp/record/9965/files/tjsmec-v61n586p2618-2623.pdf"},"version_id":"7a4dbf72-3235-4797-a0f8-b360ac3b00b1"}]},"item_keyword":{"attribute_name":"キーワード","attribute_value_mlt":[{"subitem_subject":"Production System","subitem_subject_scheme":"Other"},{"subitem_subject":"Production Planning","subitem_subject_scheme":"Other"},{"subitem_subject":"Approximation Method","subitem_subject_scheme":"Other"},{"subitem_subject":"Machining-Assembly Production System","subitem_subject_scheme":"Other"},{"subitem_subject":"Multi-Stage Series Line","subitem_subject_scheme":"Other"},{"subitem_subject":"Production Rate","subitem_subject_scheme":"Other"},{"subitem_subject":"System Parameters","subitem_subject_scheme":"Other"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"jpn"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"journal article","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"多工程直列形加工ラインが連結した自動組立生産システムの挙動解析","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"多工程直列形加工ラインが連結した自動組立生産システムの挙動解析"}]},"item_type_id":"16","owner":"3","path":["1519"],"pubdate":{"attribute_name":"公開日","attribute_value":"2010-08-24"},"publish_date":"2010-08-24","publish_status":"0","recid":"9965","relation_version_is_last":true,"title":["多工程直列形加工ラインが連結した自動組立生産システムの挙動解析"],"weko_creator_id":"3","weko_shared_id":-1},"updated":"2023-05-16T11:51:13.914100+00:00"}