WEKO3
インデックスリンク
アイテム
閉ループ形生産システムにおけるパレット投入制御
https://iwate-u.repo.nii.ac.jp/records/9833
https://iwate-u.repo.nii.ac.jp/records/983336761d2b-a171-45a5-a8f6-eab8fab11b03
名前 / ファイル | ライセンス | アクション |
---|---|---|
tjsmec-v67n655p866-872 (626.1 kB)
Restricted Access
|
|
Item type | 学術雑誌論文 / Journal Article(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2009-10-28 | |||||
タイトル | ||||||
タイトル | 閉ループ形生産システムにおけるパレット投入制御 | |||||
言語 | ||||||
言語 | jpn | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Production Sysytem | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Process Planning | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Production Planning | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Closed Loop System | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Pallet | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Input Control | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Policy | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Production Rate | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Inventory | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Markov Decision Process | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||
資源タイプ | journal article | |||||
著者 |
井山, 俊郎
× 井山, 俊郎× 水野, 雅裕× 田牧, 純一× 佐藤, 英輔 |
|||||
著者別名 | ||||||
識別子Scheme | WEKO | |||||
識別子 | 61050 | |||||
姓名 | IYAMA, Toshirou | |||||
著者別名 | ||||||
識別子Scheme | WEKO | |||||
識別子 | 61051 | |||||
姓名 | MIZUNO, Masahiro | |||||
著者別名 | ||||||
識別子Scheme | WEKO | |||||
識別子 | 61052 | |||||
姓名 | TAMAKI, Jyunnichi | |||||
著者別名 | ||||||
識別子Scheme | WEKO | |||||
識別子 | 61053 | |||||
姓名 | SATO, Eisuke | |||||
著者(機関) | ||||||
値 | 岩手大学工学部 | |||||
著者(機関) | ||||||
値 | 岩手大学工学部 | |||||
著者(機関) | ||||||
値 | 北見工業大学 | |||||
著者(機関) | ||||||
値 | 東北電力(株) | |||||
登録日 | ||||||
日付 | 2009-10-28 | |||||
書誌情報 |
日本機械学會論文集. C編 巻 67, 号 655, p. 866-872, 発行日 2001-01-01 |
|||||
ISSN | ||||||
収録物識別子タイプ | ISSN | |||||
収録物識別子 | 0387-5024 | |||||
Abstract | ||||||
内容記述タイプ | Other | |||||
内容記述 | The number of pallets circulating in a closed loop production system is an important factor which affects the production rate. If the number is large, pallets stagnate in the system. If the number is small, an idling state occurs frequently in many stages. In both cases the production rate drops. Therefore, it is necessary to control the number of in-process pallets in the system according to the states of pallet flow and stages in order to maximize the production rate. In this paper, we study the effect of pallet input control for a closed loop production system with constant operation cycle time and stage breakdown. First, we model a pallet flow in the system by a Markov model, and analyze the maximum production rate yielded in the system and the optimum policy for pallet input control by a Markov decision process. Next, we present the effectiveness of pallet input control comparing with the uncontrolled system. Finally, in order to investigate the effect of the number of pallets on the production rate, we analyze the production rate and the number of in-process pallets under the optimum policy using the reward function which consists of the production rate and the number of in-process pallets. The main results are as follows. (1) There is the optimum policy for pallet input control which yields the maximum production rate. (2) The pallet control is effective to increase the production rate and decrease the number of in-process pallets. (3) The decrease of the number of pallets monotonously reduces the production rate. However, if the buffer capacity is large, the reduction is very small near the maximum production rate. | |||||
出版者 | ||||||
出版者 | 社団法人日本機械学会 | |||||
権利 | ||||||
権利情報 | 社団法人日本機械学会 | |||||
権利 | ||||||
権利情報 | 本文データは学協会の許諾に基づきCiNiiから複製したものである | |||||
著者版フラグ | ||||||
出版タイプ | VoR | |||||
出版タイプResource | http://purl.org/coar/version/c_970fb48d4fbd8a85 | |||||
異版である | ||||||
関連タイプ | isVersionOf | |||||
識別子タイプ | URI | |||||
関連識別子 | http://ci.nii.ac.jp/naid/110002386085 |